100 shoreditch 100 shoreditch

100 Shoreditch

The majority of the MEPH systems were either replaced or validated and repurposed, with all new HVRF systems to the guestrooms and new VRF systems to the public areas installed, inclusive of new condensers and air handling plant to the fully renewed main roof.

The main challenge was validating and integrating existing MEPH systems, with new MEPH plant. This was done in close collaboration with the consultant team and our specialist, management team. We maximised the commercial and environmental benefits of retaining some systems, rather than stripping everything out and renewing. At all stages, the client was appraised of the benefits and potential pitfalls of this approach which has resulted in a successful outcome.

Delivery:

HVAC / Water leak detection / Plumbing / Drainage / BMS / LV Distribution / Electrical Installation / Lighting and emergency / Lighting control / Fire Alarm Refuge Alarm / CCTV / Security and Panic Alarm / Access control / Integrated Reception System / Lightning Protection

Key Features:

  • 258 no. rooms
  • 6 new restaurants and bars

Sustainability:

  • BREEAM - Good
  • EPC Rating B
  • Client: Lore Group
  • Project Type: Refurbishment and Extension
  • Sector: Hotel
  • Value: £1.9m
  • Main Contractor: Red Construction
  • Facilities Manager: In-house Maintenance Team
  • End User: Lore Group

Get in touch

© 2025 ONE Mep Ltd. Registered in England Number 14442153