Townsend House Townsend House

Townsend House

Demolition of existing building to make way for the new mixed use development consisting of shell and core for future retail, commercial office space levels 1-4 and 5 high end residential apartments to levels 5+6 with balconies. Appointed during the recovery from Covid, the MEP design was targeted to provide a safe working environment with air purification systems and hands free access control/automated door system.


Delivery:

  • Site temps / HVAC / Plumbing / Drainage / BMS / Dry Riser / LV Distribution / Electrical Installation / Lighting and emergency / Lighting control / Back-up Generator / Smoke Ventilation / Fire Alarm / Refuge Alarm / CCTV / Security and Panic Alarm / Access control / IT infrastructure / Lightning Protection / Sprinkler System / PV

Key Features:

  • Hybrid - VRF
  • Smart Space Enabled
  • Air Purification system
  • Touchless access control and automated doors

Sustainability:

  • BREEAM - Excellent
  • EPC Rating - A
  • WiredScore - Platinum
  • Client: ITC Properties Ltd
  • Completion: Summer 2023
  • Project Type: New Build
  • Sector: Mixed-Use
  • Value: £3.4m
  • Main Contractor: RED Construction
  • Facilities Manager: Promise FM
  • End User: Rockhopper

Get in touch

© 2025 ONE Mep Ltd. Registered in England Number 14442153